Thread: Syncing Varigate 4+ cv and gate?
How do I sync the cv and gate on the Varigate 4+ so that when pitch is outputted, a corresponding gate is fired? Right now it is all out of sync so the envelope is not opening properly.
Thanks
How do I sync the cv and gate on the Varigate 4+ so that when pitch is outputted, a corresponding gate is fired? Right now it is all out of sync so the envelope is not opening properly.
Thanks